Power
& Steam Uint
The
processing units of this plant include: the power generating units, the
steam units, dispatching. The most important characteristic of the power
station is it's compatibility with the environment. The 2 and 4 gas turbine
units have a capacity to generate 648 megawatts. The major part of the steam
generated in Fajr Petrochemical Complex is done by the heating system and the
overheated gasses by the gas turbine combustion.
The steam unit of area 1 is able to produce 935
ton per hour. The steam unit of area 2 has been designed to produce 740 ton per
hour. the overall control of the whole production system is done in site 2 and
the control room.